<?xml version="1.0" encoding="US-ASCII"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
  <title>Marine Diving Solutions</title>
  <link>http://marinedivingsolutions.com/</link>
  <description>Marine Diving Solutions - Blog RSS Feed 2.0</description>
  <language>en-us</language>
  <pubDate>Sat, 11 Apr 2026 07:35:25 GMT</pubDate>
  <lastBuildDate>Sat, 11 Apr 2026 07:35:25 GMT</lastBuildDate>
  <atom:link href="http://marinedivingsolutions.com/feed/1278/rss.xml" rel="self" type="application/rss+xml" />
  <image>
    <url>http&#x3a;&#x2f;&#x2f;marinedivingsolutions.com&#x2f;userfiles&#x2f;1278&#x2f;images&#x2f;Morris&#x25;20Sheppard&#x25;20pic&#x25;202&#x25;2D&#x25;20erecta&#x25;20steps&#x25;2Ejpg</url>
    <title>Marine Diving Solutions</title>
    <link>http://marinedivingsolutions.com/</link>
  </image>
  <item>
    <title>Possum Kingdom Morris Sheppard Dam Spillway Pump and Piping Improvements Project</title>
    <link>http://marinedivingsolutions.com/blog/23261/Possum-Kingdom-Morris-Sheppard-Dam-Spillway-Pump-and-Piping-Improvements-Project</link>
    <category>blog</category>
    <description>Project Summary&#x3a; The Brazos River Authority owns and operates Morris Sheppard Dam, which forms Possum Kingdom Reservoir, which is a water supply reservoir, and is located in Palo Pinto County in Texas. Morris Sheppard Dam was constructed in 1941 and consists of an Ambursen flat-slab and buttress dam structure with a service spillway, earthen embankment section, emergency spillway, intake structure in addition to a 78 inch and 42 inch controlled outlet conduit. The service spillway section consists of nine bear-trap &#x28;roof weir&#x29; gates that pass floodwater downstream. Under normal conditions, the spillway gates are hydraulically operated by reservoir head. Reservoir water is allowed to flow into the gate chamber beneath the gate, making it buoyant, then the gate leaves are unlatched and lowered to release the water. To assist with gate operations during low reservoir conditions &#x28;i.e., elevation 995 and below&#x29;, a spillway pump and piping system was utilized to supply pressurized water into the underside of the gates to assist in lowering and raising the gates. Due to modifications to the spillway piping in the dam &#x28;as part of a previous project&#x29;, the spillway pump and piping system were disconnected. This project consisted of the supply and installation of new pipeline, valves, and conduit, providing temporary electrical services and performing final testing.&#xd;&#xa;</description>
    
    <pubDate>Tue, 18 Mar 2025 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/23261/Possum-Kingdom-Morris-Sheppard-Dam-Spillway-Pump-and-Piping-Improvements-Project</guid>
  </item>

  <item>
    <title>Yamcolo 36&#x201d; Butterfly Valve Replacement Project </title>
    <link>http://marinedivingsolutions.com/blog/23147/Yamcolo-36--Butterfly-Valve-Replacement-Project-</link>
    <category>blog</category>
    <description>Project Summary&#x3a; Marine Diving Solutions mobilized to Yamcolo Reservoir near Yampa, Colorado to replace the 36&#x22; butterfly valve.&#x26;&#x23;160&#x3b; This project involved setting up a bypass system and erosion and sediment control plan to de-water the area for the removal and new installation of the 36&#x22; butterfly valve. Additional work included repairing the concrete wall and steel pipe coal tar interior lining.</description>
    
    <pubDate>Tue, 18 Jun 2024 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/23147/Yamcolo-36--Butterfly-Valve-Replacement-Project-</guid>
  </item>

  <item>
    <title>Jennings Randolph Lake Backup Hydraulic System </title>
    <link>http://marinedivingsolutions.com/blog/23148/Jennings-Randolph-Lake-Backup-Hydraulic-System-</link>
    <category>blog</category>
    <description>Project Summary&#x3a; Marine Diving Solutions was awarded this contract to provide and install one hydraulic power unit &#x28;HPU&#x29; on the 1,337&#x27; elevation level of the intake tower and incorporate the unit both hydraulically and electrically to the existing HPU system. The HPU was to be designed and fabricated to conform to the specifications of the contract as well as be installed into the existing unit on site and tested. Project installation was scheduled for winter months for minimum environmental impact. Due to aging infrastructure of gate cylinders, MDS was issued a modification to our contract for the rehabilitation of E1 gate cylinder.&#xd;&#xa;</description>
    
    <pubDate>Tue, 18 Jun 2024 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/23148/Jennings-Randolph-Lake-Backup-Hydraulic-System-</guid>
  </item>

  <item>
    <title>Stillwater Reservoir Hydraulic Upgrades Project </title>
    <link>http://marinedivingsolutions.com/blog/23149/Stillwater-Reservoir-Hydraulic-Upgrades-Project-</link>
    <category>blog</category>
    <description>Project Summary&#x3a; Marine Diving Solutions mobilized to Stillwater Reservoir near Yampa, Colorado to replace hydraulic lines and perform hydraulic upgrades. The existing hydraulic cylinder lines and vent pipe and supports were removed. MDS provided and installed 3&#x22; 316 stainless steel encasement conduit ranging from 6&#x27; to 20&#x27; lengths and installed them within feet downstream of the slide gates and ran the pipe next to the HPU building. MDS also provided and installed flexible hydraulic hose with 316 stainless fittings for the transitions. The existing HPU was replaced with 2 new HPU units and a bypass connection. Hydraulic oil was provided for the hydraulic cylinders, new lines and HPU.&#xd;&#xa;</description>
    
    <pubDate>Tue, 18 Jun 2024 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/23149/Stillwater-Reservoir-Hydraulic-Upgrades-Project-</guid>
  </item>

  <item>
    <title>Bulkhead Placement and Conduit Repairs - Abiquiu Dam, NM </title>
    <link>http://marinedivingsolutions.com/blog/23086/Bulkhead-Placement-and-Conduit-Repairs---Abiquiu-Dam--NM-</link>
    <category>blog</category>
    <description>Project Summary&#x3a; The U.S. Army Corps of Engineers, Albuquerque District &#x28;USACE&#x29; created this contract to make routine maintenance repairs to the conduits at Abiquiu Dam and Lake Project during the winter months &#x28;November 2023 to February 2024&#x29;, outside of the irrigation season. The contract involved debris removal within submerged bulkhead slots and immediate upstream area, placement of bulkheads, constructing flow diversion and environmental controls, removal of corrosion or other surface contaminants on steel liner&#x2f;emergency gates&#x2f;service gates, application of new coating system, and metals repairs. The conduit is a permit-required confined space while work is performed, therefore MDS provided a stand-by rescue crew during the blasting and coating procedures and complied with USACE lockout&#x2f;tagout procedures per the contract. The inlet structure was fully submerged so the MDS dive team cleared the slots before the 12,000lb and 13,500lb bulkhead placements to ensure proper seating. The contract also involved providing and operating a hydraulic pump with flexible hosing and connections that adapt to the existing sluicing gates and maintain operation from the surface. MDS created a coffer dam diversion upstream of the emergency gates that directs 50cfs flows to the opposite side of work being performed and created a dry work environment for the side where work was performed for a dry work environment that was humidity controlled. Due to impacts to the Rio Chama and downstream water users, complete dam closures were limited to ensure project timelines.&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;&#x26;&#x23;160&#x3b;</description>
    
    <pubDate>Fri, 09 Feb 2024 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/23086/Bulkhead-Placement-and-Conduit-Repairs---Abiquiu-Dam--NM-</guid>
  </item>

  <item>
    <title>Hoover Dam Intake Tower</title>
    <link>http://marinedivingsolutions.com/blog/22872/Hoover-Dam-Intake-Tower</link>
    <category>blog</category>
    <description>Project Description&#x3a; Hoover Dam is a 5-year Indefinite Quantity type contract that involves fabrication of new gate stem assemblies for a Delivery Order each year, and the construction work of the Task Order involves the replacement of the materials fabricated. The goal of this project is to replace the gate stem assemblies of up to 4 of the intake towers with corrosion -resistant stem assemblies one intake tower per year with the second year being skipped and the final construction planned to end the fiscal year of 2026. Marine Diving Solutions LLC contracted with Quabbin Inc.&#x2f;Amherst Tool for the fabrication of the custom gate stem assemblies while MDS is performing the removal and installations. This project involves confined space work including lock out&#x2f;tag out procedures, special work permits, and requires the team to safely work from suspended baskets 330&#x27; in the towers and replace approximately 1,200&#x27; of stem for each tower along with other brackets, hardware, and operator rehabilitation.&#xd;&#xa;&#x26;&#x23;194&#x3b;&#x26;&#x23;160&#x3b;&#x26;&#x23;194&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Mon, 27 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22872/Hoover-Dam-Intake-Tower</guid>
  </item>

  <item>
    <title>Cheney Dam Footbridge Pier Removal </title>
    <link>http://marinedivingsolutions.com/blog/21919/Cheney-Dam-Footbridge-Pier-Removal-</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided the removal of an 8&#x27; diameter, reinforced concrete bridge pier that had been abandoned.&#x26;&#x23;160&#x3b; The pier was cut into 3&#x27; sections weighing 27,000 lbs. each with the use of a submersible wire saw.&#x26;&#x23;160&#x3b; MDS also removed and replaced the gate stems, stem guides and operator nuts for four control gates and one emergency gate.&#x26;&#x23;160&#x3b; Ice shields were also fabricated and installed on the 75&#x27; high gate tower to protect the new stems.&#x26;&#x23;160&#x3b; This project was a design build to keep costs lower for the customer.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;	Use of submersible wire saw&#xd;&#xa;	Use of barge and 80-ton crane&#xd;&#xa;	Replacement of gate stems, stem guides, operator hardware&#xd;&#xa;	Fabricated and installed ice shields on 75&#x27; high gate tower&#xd;&#xa;	Commercial diving of reservoir&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;&#x26;&#x23;160&#x3b;</description>
    
    <pubDate>Sun, 26 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/21919/Cheney-Dam-Footbridge-Pier-Removal-</guid>
  </item>

  <item>
    <title>Gross Reservoir- Auxiliary Phase 1 </title>
    <link>http://marinedivingsolutions.com/blog/22869/Gross-Reservoir--Auxiliary-Phase-1-</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided a commercial dive crew, commercial dive equipment, modular barge sections, underwater LiDAR survey equipment and other specialized equipment for the Gross Reservoir Auxiliary Intake Phase project at Gross Dam in Boulder County, Colorado. MDS to provide a dive inspection at the auxiliary intake structure. Divers removed two trash racks to enter the structure. Once inside of the structure, divers removed sediment that has accumulated inside of the structure &#x28;estimated to be up to 10 cy&#x29;. With the sediment removed, divers then positioned a tripod LiDAR imaging unit to scan the face of the wall where a new gate will be installed in 2023. Divers then removed the tripod imaging unit and put the trash rack&#x28;s&#x29; back on the structure.&#xd;&#xa;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Sat, 25 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22869/Gross-Reservoir--Auxiliary-Phase-1-</guid>
  </item>

  <item>
    <title>The Low Flow Outlet Works Project at De Cordova Bend Dam</title>
    <link>http://marinedivingsolutions.com/blog/22883/The-Low-Flow-Outlet-Works-Project-at-De-Cordova-Bend-Dam</link>
    <category>blog</category>
    <description>Project Description&#x3a; The Low Flow Outlet Works Project at De Cordova Bend Dam &#x28;Lake Granbury&#x29; involved replacement and repair of various low flow outlet sluice gates and ancillary components to better meet operational requirements. The project included the following&#x3a; replacing two &#x28;2&#x29; cast iron slide gates with stainless-steel, installation of a new hydraulic power unit, recoating components of gates 1-6, gate control programming and integration activities and replacing hydraulic cylinders on gates 1-6 to ensure proper operation at the dam. The project significantly improved dam operations and extended the service life of the Low Flow Outlet Works.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;	Floating barge&#x2f;dive vessel operations&#xd;&#xa;	Crane operations&#xd;&#xa;	Commercial diving operations&#xd;&#xa;	Hydraulic power unit &#x28;HPU&#x29; replacement&#xd;&#xa;	Replacement of two gates&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 22 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22883/The-Low-Flow-Outlet-Works-Project-at-De-Cordova-Bend-Dam</guid>
  </item>

  <item>
    <title>Bear Canyon Dam Gate Replacement</title>
    <link>http://marinedivingsolutions.com/blog/22871/Bear-Canyon-Dam-Gate-Replacement</link>
    <category>blog</category>
    <description>Project Description&#x3a; After initially inspecting the dam, Marine Diving Solutions worked with a structural engineering firm &#x28;SM&#x26;RC&#x29; to formulate and carry out plan for the construction of a conduit bulkhead within approximately 5&#x27; of the dam gate to provide a secondary way to contain the water during gate replacement. Marine Diving Solutions demolished the current gate house building on the crest of the dam, injected a chemical grout to minimize leakage in rock pocket of outlet pipe approximately 5&#x27; downstream of gate. An 18&#x22; diameter pipe was moved into the outlet pipe and centralized so a form could be built for the concrete bulkhead. Concrete was pumped from outside of the conduit into the form. After concrete was solid, the forms were removed so a hinged blind flange could be installed on the downstream side of the 18&#x22; pipe. Sediment on the floor in front of the gate was removed and the slide gate, stem, stem guides and operator were removed. A new hole was cored for new gate and new steel plate&#x2f;wall thimble were installed. The concrete floor was raised from new wall thimble to 2&#x27; upstream from new plate by 2&#x27; for a leak free seal. A concrete lip was also poured. New gate, stem, stem guides and operator were installed on the dam with fencing. The blind flange was unbolted in open position and any voids or holes were dry packed.&#xd;&#xa;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Fri, 03 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22871/Bear-Canyon-Dam-Gate-Replacement</guid>
  </item>

  <item>
    <title>Kissing Camels Dredging Project </title>
    <link>http://marinedivingsolutions.com/blog/22868/Kissing-Camels-Dredging-Project-</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions &#x28;MDS&#x29; was hired to dredge and inspect the 20&#x22; intake pipe and wet well supplying the irrigation water pumps for Kissing Camels Golf Course. MDS dredged approximately 20 yards of sediment and rock to uncover the buried supply pipe.&#xd;&#xa;Upon completion of the job, Kissing Camels Golf Course was able to have full operation of their pumps and irrigation systems.&#xd;&#xa;&#xd;&#xa;. </description>
    
    <pubDate>Fri, 03 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22868/Kissing-Camels-Dredging-Project-</guid>
  </item>

  <item>
    <title>Joe Wright Gate Replacement </title>
    <link>http://marinedivingsolutions.com/blog/22870/Joe-Wright-Gate-Replacement-</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions demolished the existing stem, stem guides, stem guide brackets and gate utilizing an 80-ton crane. The new rising stem knife valve was installed with EPDM rubber gaskets at each flange and all new stainless-steel bolts were installed.&#x26;&#x23;160&#x3b; The new 1-1&#x2f;4&#x22; diameter stem is stainless steel. The stem guides are cast steel, anchors are mild steel, all stainless-steel hardware, bronze bushings, and steel collars with epoxy paint. The new low-flow knife gate valve was operated and reported that it functioned smoothly.&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;	Crane operations&#xd;&#xa;	Commercial diving operations&#xd;&#xa;	Demolition and installation of new knife valve&#xd;&#xa;	High elevation dive operations&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;194&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Fri, 03 Mar 2023 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/22870/Joe-Wright-Gate-Replacement-</guid>
  </item>

  <item>
    <title>Investigation and Repair of Outlet Control Valves at Juniata Reservoir</title>
    <link>http://marinedivingsolutions.com/blog/21475/Investigation-and-Repair-of-Outlet-Control-Valves-at-Juniata-Reservoir</link>
    <category>blog</category>
    <description>Project Description&#x3a;&#x26;&#x23;160&#x3b;Marine Diving Solutions provided commercial diving services at Juniata Reservoir to investigate the outlet control valves to see what repairs needed to be done. The trash rack was also removed per the City of Grand Junctions instructions. The North outlet valve assembly was removed at the mid-level outlet so that the City of Grand Junction can purchase new valves and actuators for the future replacement of the outlet valves to control flows out of Juniata Reservoir.&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Commercial diving at Juniata Reservoir up to 100&#x27; deep after altitude correction&#xd;&#xa;	Trash rack removal&#xd;&#xa;	Underwater ultrathermic cutting &#x28;Broco&#x29;&#xd;&#xa;	Investigation for repairs or replacement of valves and hydraulic cylinders&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Fri, 21 Aug 2020 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/21475/Investigation-and-Repair-of-Outlet-Control-Valves-at-Juniata-Reservoir</guid>
  </item>

  <item>
    <title>Wolford Reservoir Improvements for Colorado River Water Conservation District</title>
    <link>http://marinedivingsolutions.com/blog/21474/Wolford-Reservoir-Improvements-for-Colorado-River-Water-Conservation-District</link>
    <category>blog</category>
    <description>Project Summary&#x3a;&#x26;&#x23;160&#x3b;Marine Diving Solutions performed commercial diving services at Wolford Dam to remove the existing main gate and install the new owner supplied gate. The trash rack was also removed, coated and re-installed.&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Commercial diving of reservoir&#xd;&#xa;	Barge supply and use&#xd;&#xa;	High altitude diving operations&#xd;&#xa;	Vessel Operations&#xd;&#xa;	Deep dives that were at 170&#x27;&#x26;&#x23;160&#x3b;after altitude correction&#xd;&#xa;	Removal and installation of gate&#xd;&#xa;	Trash rack rehabilitation&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Fri, 21 Aug 2020 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/21474/Wolford-Reservoir-Improvements-for-Colorado-River-Water-Conservation-District</guid>
  </item>

  <item>
    <title>Repair Hydraulic Cylinders and Position Indicators at Colebrook River Lake, Connecticut for the USACE </title>
    <link>http://marinedivingsolutions.com/blog/21473/Repair-Hydraulic-Cylinders-and-Position-Indicators-at-Colebrook-River-Lake--Connecticut-for-the-USACE-</link>
    <category>blog</category>
    <description>Project Summary&#x3a;&#x26;&#x23;160&#x3b;Marine Diving Solutions provided the removal of 6 hydraulic cylinders, repairs, and re-installation for the USACE. Additional services included oil testing and filtration.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;- ROV inspection underwater&#xd;&#xa;&#xd;&#xa;- Bulkhead installation and removal&#xd;&#xa;&#xd;&#xa;- Removal and reinstallation of six flanged gate cylinders&#x3a;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b; - 200&#x27; vertical lift from gate chamber to bridge deck.&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b; - Required to be disassembled prior to lifting.&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b; - 26.5&#x22;&#x26;&#x23;160&#x3b;OD cylinder barrel, 113&#x27; long, appx. 5000 lbs each&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b; - 15&#x22;&#x26;&#x23;160&#x3b;long, 5&#x27; OD cylinder ram, appx. 1000 lbs each&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b; - All pipe barrels and cylinder rams had to be rotated from vertical to horizontal after lifting, for removal&#xd;&#xa;&#xd;&#xa;- Oil filtration and testing&#xd;&#xa;&#xd;&#xa;- Working in suspended and fall restriction area&#xd;&#xa;&#xd;&#xa;- Modifications including fabrication and welding to the hydraulic operating system piping. Approximately 100&#x27; of 1.25&#x22;&#x26;&#x23;160&#x3b;Sched 80 pipe.&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Fri, 21 Aug 2020 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/21473/Repair-Hydraulic-Cylinders-and-Position-Indicators-at-Colebrook-River-Lake--Connecticut-for-the-USACE-</guid>
  </item>

  <item>
    <title>Replacement of Trash Rack at the West Outlet at Barr Lake</title>
    <link>http://marinedivingsolutions.com/blog/21471/Replacement-of-Trash-Rack-at-the-West-Outlet-at-Barr-Lake</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided the demolition of existing hoods and trash racks, and installations of hybrid gate cylinder, new grout cap, vertical trash rack guides, support beam marks, vertical trash rack, horizontal trash rack and hoods at Barr Lake in Brighton, Colorado.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;	Commercial diving of reservoir&#xd;&#xa;	Removal and installation of trash racks and hoods&#xd;&#xa;	Dredging work at the base of the intake prior to the vertical trash rack demolition&#xd;&#xa;	Work performed on floating platform and underwater&#xd;&#xa;	Installation of hybrid gate cylinder and instrument cabling, new grout cap for the left intake structure wingwall, new vertical trash rack and components, and new horizontal trash racks, hoods and supports&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Thu, 20 Aug 2020 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/21471/Replacement-of-Trash-Rack-at-the-West-Outlet-at-Barr-Lake</guid>
  </item>

  <item>
    <title>Pueblo Water Tank Roof Replacements Project</title>
    <link>http://marinedivingsolutions.com/blog/16509/Pueblo-Water-Tank-Roof-Replacements-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided construction services to include the removal and replacement of two 120-foot roofs off potable water tanks and replacing the old steel roofs with new lightweight aluminum roofs.&#xd;&#xa;&#xd;&#xa;Services Include&#x3a; &#xd;&#xa;&#xd;&#xa;	Welding over 1,200&#x27;&#x26;&#x23;160&#x3b;of roof supports.&#xd;&#xa;	Fabricating all new ladders, safety platforms and safety climb systems.&#xd;&#xa;	Utilizing multiple cranes and critical picks to safely remove the old roofs.&#xd;&#xa;	Welding, plasma cutting and rigging were key components needed to complete this large project.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Thu, 16 Aug 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/16509/Pueblo-Water-Tank-Roof-Replacements-Project</guid>
  </item>

  <item>
    <title>Steamboat Lake Gate Replacement Project</title>
    <link>http://marinedivingsolutions.com/blog/16508/Steamboat-Lake-Gate-Replacement-Project</link>
    <category>blog</category>
    <description>Project description&#x3a; Marine Diving Solutions provided commercial dive services including diving off a barge in depths up to 130&#x27; to remove and replace a 96 inch control gate that had been previously leaking at Steamboat Lake in Craig, CO&#xd;&#xa;&#xd;&#xa;Services include&#x3a;&#xd;&#xa;&#xd;&#xa;	Diving to unbolt the 96 inch control gate using a hydraulic bolt tensioner.&#xd;&#xa;	Use of barge and crane to safely remove the gate out of water.&#xd;&#xa;	A blind flange was installed until the new gate arrived and was installed.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Thu, 16 Aug 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/16508/Steamboat-Lake-Gate-Replacement-Project</guid>
  </item>

  <item>
    <title>Guajataca Lake Stem Replacement, Puerto Rico </title>
    <link>http://marinedivingsolutions.com/blog/16510/Guajataca-Lake-Stem-Replacement--Puerto-Rico-</link>
    <category>blog</category>
    <description>Project Summary&#x3a;&#x26;&#x23;160&#x3b;This project was initiated by the USACE to help the Puerto Rico Electric Power Authority &#x28;PREPA&#x29; due to damage caused by Hurricane Maria. The project involved the replacement of the operator, stem, stem guides and trash rack at the Guajataca Dam in Isabella, Puerto Rico. MDS installed a new stem, stem guides and operator that were supplied by a Quabbin Inc.&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#x26;&#x23;8226&#x3b; Stem, stem guides and operator removal and installation required the use of a Spider scaffold in order to reach otherwise inaccessible locations above water. A custom frame with hoist attached was engineered and erected by MDS specifically for this project.&#xd;&#xa;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; -Removal of bent 4&#x22; diameter steel stem sections in 20&#x27; lengths, overall 80&#x27; long both above and below water.&#xd;&#xa;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; -Removal of existing 2,500lb operator and replacement with a new operator.&#xd;&#xa;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; -Removal of 4 remaining stem guides both above and below water.&#xd;&#xa;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; -Installation of 9 stainless steel stem guides with stainless hardware both above and below water.&#xd;&#xa;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; -Installation of 3.5&#x22; diameter stainless stem section vertically in 9&#x27; lengths weighing 350lbs each, overall 80&#x27;&#x26;&#x23;160&#x3b; &#x26;&#x23;160&#x3b; long both above and below water.&#xd;&#xa;&#x26;&#x23;8226&#x3b; Fabrication and installation of new trash rack 6&#x27;long X 3&#x27;wide weighing 500lbs.&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Thu, 16 Aug 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/16510/Guajataca-Lake-Stem-Replacement--Puerto-Rico-</guid>
  </item>

  <item>
    <title>Town of Fleming Water Tower Rehabilitation Project</title>
    <link>http://marinedivingsolutions.com/blog/14331/Town-of-Fleming-Water-Tower-Rehabilitation-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and rehabilitation services for a 75KG water tower.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Fabrication and installation of a ladder on the exterior of the water tank with landing platforms and wire safety fall arrest systems&#xd;&#xa;	Fabrication and installation of a ladder on the interior of the water tank&#x26;&#x23;160&#x3b;&#xd;&#xa;	Guardrail fabrication and installation on the roof of the water tank&#xd;&#xa;	Removal of a broken 8&#x22; x&#x26;&#x23;160&#x3b;120&#x27; vertical riser pipe removal&#xd;&#xa;	Foundation excavation for a new pipe placement&#xd;&#xa;	Concrete forming and foundation for a new 8&#x22;&#x26;&#x23;160&#x3b;diameter by 130&#x27; vertical freestanding ductile iron pipe placement&#xd;&#xa;	Backfilling and compaction around piping &#x28;10&#x27; deep&#x29;&#xd;&#xa;	Installation of 120&#x27; vertical ductile iron pipe&#xd;&#xa;	Fabrication and installation of custom flange to the base of the water tank&#xd;&#xa;	Removal of existing side supports for vertical riser&#xd;&#xa;	Installation of new supports for vertical riser pipe&#xd;&#xa;	Epoxy repairs to corrosion areas due to use on interior of the water tower&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14331/Town-of-Fleming-Water-Tower-Rehabilitation-Project</guid>
  </item>

  <item>
    <title>Swans Nest Metro District Ice Protection Upgrades Project</title>
    <link>http://marinedivingsolutions.com/blog/14336/Swans-Nest-Metro-District-Ice-Protection-Upgrades-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and repair services for a 300KG water tank.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Installation of electrical lines to provide power to a water tank that was approximately 1 mile up a mountain from the closest power source&#xd;&#xa;	Coating repairs to the inside of the water tank at water level due to ice damage&#xd;&#xa;	Installation of a PAX water mixer to prevent ice damage.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14336/Swans-Nest-Metro-District-Ice-Protection-Upgrades-Project</guid>
  </item>

  <item>
    <title>Town of Red Cliff Water Tank Insulation Replacement and Upgrades Project</title>
    <link>http://marinedivingsolutions.com/blog/14335/Town-of-Red-Cliff-Water-Tank-Insulation-Replacement-and-Upgrades-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and removal services for a 250KG water tank built in&#x26;&#x23;160&#x3b;the 1960&#x27;s.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Fabrication and installation of a ladder on the exterior of the water tank with a wire rope safety fall arrest system&#xd;&#xa;	Removal of failing foam&#xd;&#xa;	Installation of Foamglass foam insulation&#xd;&#xa;	Raising roof panels back into place that had failed due to severe snow fall&#xd;&#xa;	Installation of custom supports for reinforcing roof panels&#xd;&#xa;	Installation of a 3&#x27; wide x&#x26;&#x23;160&#x3b;15&#x27; long platform&#x2f;catwalk on top of the tank&#xd;&#xa;	Removal and replacement of existing vent with a new 24&#x22;&#x26;&#x23;160&#x3b;frost proof vent with extended neck for severe winter months&#xd;&#xa;	Installation of aluminum jacketing to protect Foamglass foam insulation&#xd;&#xa;	Cleaning and inspection to the interior of the water tank&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14335/Town-of-Red-Cliff-Water-Tank-Insulation-Replacement-and-Upgrades-Project</guid>
  </item>

  <item>
    <title>Department of Veteran Affairs Water Tower Rehabilitation Project</title>
    <link>http://marinedivingsolutions.com/blog/14338/Department-of-Veteran-Affairs-Water-Tower-Rehabilitation-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and removal services for a 100KG water tower built in&#x26;&#x23;160&#x3b;the 1940&#x27;s.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Fabrication and installation of a ladder for the exterior of the water tank with a wire safety fall arrest systems&#xd;&#xa;	Fabrication and installation of a ladder for the interior of the water tank with a wire safety fall arrest systems&#xd;&#xa;	Installation of&#x26;&#x23;160&#x3b;30&#x22;&#x26;&#x23;160&#x3b;and&#x26;&#x23;160&#x3b;24&#x22; diameter&#x26;&#x23;160&#x3b;manways&#xd;&#xa;	Repair of cracks and spalling in the structural foundation of the tank&#xd;&#xa;	Welding of base anchor bolts and nuts&#xd;&#xa;	Replacement of roof access hatch and vent&#xd;&#xa;	Raising of 6&#x22;&#x26;&#x23;160&#x3b;inlet and 8&#x22;&#x26;&#x23;160&#x3b;outlet pipes 150&#x27; to the interior of the water tank&#xd;&#xa;	Sealing top of riser to tank to make wet riser into a dry riser&#xd;&#xa;	Installation of a 5&#x22;&#x26;&#x23;160&#x3b;overflow 150&#x27; with splash pad and security flapper valve&#xd;&#xa;	Raising of handrail to meet current OSHA compliance&#xd;&#xa;	Welding of the circumference of the post head to shell connections&#xd;&#xa;	Installing a handrail at the top of the tank for safety of personnel&#xd;&#xa;	Replacing of access hatch for entry into the tank from the top of the tank&#xd;&#xa;	75&#x25; of all work was completed using man lifts and suspended activities&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14338/Department-of-Veteran-Affairs-Water-Tower-Rehabilitation-Project</guid>
  </item>

  <item>
    <title>Heron Water Tank Blast and Re-coat Project</title>
    <link>http://marinedivingsolutions.com/blog/14337/Heron-Water-Tank-Blast-and-Re-coat-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided an interior and exterior blast and recoat to a 150KG water storage tank.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Interior blast and recoat to an SSPC SP10&#xd;&#xa;	Exterior blast and recoat to an SSPC SP6&#xd;&#xa;	Installation of a frost proof vent.&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14337/Heron-Water-Tank-Blast-and-Re-coat-Project</guid>
  </item>

  <item>
    <title>Town of Hugo Water Tower Rehabilitation Project</title>
    <link>http://marinedivingsolutions.com/blog/14333/Town-of-Hugo-Water-Tower-Rehabilitation-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and rehabilitation services for a 100KG water tower.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Weld repairs to the wall panel to roof panels to seal gap to meet AWWA code&#xd;&#xa;	Replacement of outdated barn hatch with a 24&#x22;&#x26;&#x23;160&#x3b;AWWA compliant one&#xd;&#xa;	Installation of a frost proof vent&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14333/Town-of-Hugo-Water-Tower-Rehabilitation-Project</guid>
  </item>

  <item>
    <title>Board of Water Works of Pueblo Colorado La Vista Tanks Roof Drainage Improvements Project</title>
    <link>http://marinedivingsolutions.com/blog/14339/Board-of-Water-Works-of-Pueblo-Colorado-La-Vista-Tanks-Roof-Drainage-Improvements-Project</link>
    <category>blog</category>
    <description>Project description&#x3a; Marine Diving Solutions provided drainage, ventilation and safety improvements to two 3MG water tanks.&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Fabrication and installation of a wire safety fall arrest systems&#xd;&#xa;	Fabrication and installation of frost proof vents&#xd;&#xa;	Installation of vents&#xd;&#xa;	Fabrication of numerous custom aluminum components&#xd;&#xa;	Installation of upgraded overflows&#xd;&#xa;	50&#x25; of all work was completed using man lifts and suspended activities&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14339/Board-of-Water-Works-of-Pueblo-Colorado-La-Vista-Tanks-Roof-Drainage-Improvements-Project</guid>
  </item>

  <item>
    <title>Town of Simla Tank Rehabilitations Project</title>
    <link>http://marinedivingsolutions.com/blog/14334/Town-of-Simla-Tank-Rehabilitations-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and replacement services for 3 water tanks ranging from 44KG to 250KG.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Concrete foundation repairs&#xd;&#xa;	Replacement of outdated barn hatches with 24&#x22;&#x26;&#x23;160&#x3b;AWWA compliant type&#xd;&#xa;	Installation of a frost proof vents&#xd;&#xa;	Replacement of level indicators&#xd;&#xa;	Lowering overflows to ground level on each of the tanks&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14334/Town-of-Simla-Tank-Rehabilitations-Project</guid>
  </item>

  <item>
    <title>Town of Loving Water Tower Overflow Upgrades Project</title>
    <link>http://marinedivingsolutions.com/blog/14332/Town-of-Loving-Water-Tower-Overflow-Upgrades-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided fabrication, installation, and rehabilitation services for a 200KG water storage tower.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Shop prepping of 140&#x27; of 12&#x22;&#x26;&#x23;160&#x3b;schedule 40 pipe with coating&#xd;&#xa;	Installation of 140&#x27; of 12&#x22;&#x26;&#x23;160&#x3b;pipe in the field&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14332/Town-of-Loving-Water-Tower-Overflow-Upgrades-Project</guid>
  </item>

  <item>
    <title>Town of Naturita Water Tank Exterior Recoat and Vent Upgrade Project</title>
    <link>http://marinedivingsolutions.com/blog/14340/Town-of-Naturita-Water-Tank-Exterior-Recoat-and-Vent-Upgrade-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a; Marine Diving Solutions provided an exterior blast and recoat, replacement of vent with a larger frost proof design and installation of a wire rope fall arrest system.&#xd;&#xa;&#xd;&#xa;Services Included&#x3a;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;	Fabrication and installation of a 24&#x22;&#x26;&#x23;160&#x3b;frost proof vent&#xd;&#xa;	Installation of a wire rope fall arrest system&#xd;&#xa;	Blast and recoat of exterior of tank to a SSPC-SP6&#xd;&#xa;	&#x26;&#x23;160&#x3b;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;</description>
    
    <pubDate>Wed, 07 Mar 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/14340/Town-of-Naturita-Water-Tank-Exterior-Recoat-and-Vent-Upgrade-Project</guid>
  </item>

  <item>
    <title>Chatfield Reservoir Dewatering Project </title>
    <link>http://marinedivingsolutions.com/blog/13653/Chatfield-Reservoir-Dewatering-Project-</link>
    <category>blog</category>
    <description>Project description&#x3a; Marine Diving Solutions de-watered over 5MG gallons of water to clean, make repairs, and get a detailed in-depth inspection for the Army Corps of Engineers &#x28;USACE&#x29;.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#xd;&#xa;	Use of&#x26;&#x23;160&#x3b;multiple pumps in order to de-water the stilling basin.&#xd;&#xa;	Power washed and scrubbed the walls clean of all built up marine growth and heavy staining.&#xd;&#xa;	Crane operations to install 2 ladders and to clear large debris&#x26;&#x23;160&#x3b;&#x28;rocks and logs&#x29; from the stilling basin.&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#xd;&#xa;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Thu, 04 Jan 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/13653/Chatfield-Reservoir-Dewatering-Project-</guid>
  </item>

  <item>
    <title>Rueter-Hess Reservoir Improvements Project</title>
    <link>http://marinedivingsolutions.com/blog/13654/Rueter-Hess-Reservoir-Improvements-Project</link>
    <category>blog</category>
    <description>Project Description&#x3a;&#x26;&#x23;160&#x3b;This project involved the installation of a Worthington debris boom at Rueter Hess reservoir. Project required installation of nine &#x28;9&#x29; 10,000-lb concrete blocks for in-water anchor locations up to 150-feet deep. The blocks were tied together to form larger anchor points. The project also included installing five &#x28;5&#x29; Manta Ray anchors at each shoreline anchor location. Steel plates were fabricated by MDS and installed with backing plate washers to hold in place. The Worthington boom sections were then tied to both land and water anchors with use of shackles and galvanized wire rope. Total length of wire rope was 600-feet at each in-water location.&#xd;&#xa;&#xd;&#xa;Services included&#x3a;&#xd;&#xa;&#x26;&#x23;8226&#x3b; Commercial diving services&#xd;&#xa;&#x26;&#x23;8226&#x3b; Vessel water platform&#xd;&#xa;&#x26;&#x23;8226&#x3b; Install of Manta Ray anchor system and Worthington boom unit&#xd;&#xa;&#x26;&#x23;8226&#x3b; Installation of galvanized wire rope and accessories&#xd;&#xa;&#x26;&#x23;160&#x3b;&#x26;&#x23;160&#x3b;&#xd;&#xa;</description>
    
    <pubDate>Thu, 04 Jan 2018 06:00:00 GMT</pubDate>
    <guid>http://marinedivingsolutions.com/blog/13654/Rueter-Hess-Reservoir-Improvements-Project</guid>
  </item>

</channel>
</rss>