Project description: Marine Diving Solutions is demoing and replacing a gate stem used to regulate the water level in Guajataca Lake, Puerto Rico after it was affected by the hurricanes in recent years.
Services Included:
- Marine Diving Solutions removed the stem operator and old stem that had been damaged previously.
- MDS provided demolition and replacement of the gate stem to support two winches used to remove the 3 ½ inch stem measuring over 90 feet.