Raystown Dam Hydraulic Mechanical Gate and Bulkhead Replacements
Project Summary: This project involves the replacement and modernization of critical water control systems at Raystown Dam, including the warm water slide gate, four hydraulically operated tunnel outlet gates, and two bulkheads. The scope includes complete replacement of the warm water slide gate and tunnel outlet gates, along with their associated hydraulic hoist systems, mechanical components, and controls. The project requires specialized marine construction operations, including barge-mounted equipment, heavy crane lifts, and commercial diving operations at depths reaching 170 feet. Additional work includes extensive rehabilitation of the primary spillway through hydrodemolition, concrete repairs, installation of new waterstops and dowels, and reconstruction of spillway joints. These improvements will enhance operational reliability, extend the service life of essential infrastructure, and support the continued safe operation of Raystown Dam.