Return To Blog

Chatfield Dewatering


Project description: Marine Diving Solutions De-Watered over 5,000,000 gallons of water to clean, make repairs, and get a detailed in-depth inspection for the army corps of engineers.

Services included:
  • Marine Diving used multiple pumps in order to de-water the stilling basin.
  • Power washed and scrubbed the walls clean of all built up marine growth and heavy staining.
  • MDS used crane operation to install 2 ladders and to clear large debris such as rocks and logs from the stilling basin.