Project description: Marine Diving Solutions de-watered over 5MG gallons of water to clean, make repairs, and get a detailed in-depth inspection for the Army Corps of Engineers (USACE).
Services included:
- Use of multiple pumps in order to de-water the stilling basin.
- Power washed and scrubbed the walls clean of all built up marine growth and heavy staining.
- Crane operations to install 2 ladders and to clear large debris (rocks and logs) from the stilling basin.