Department of Veteran Affairs Water Tower Rehabilitation


October 2014

Project Description: Marine Diving Solutions provided fabrication, installation, and removal services for a 100KG water tower from the 1940's.

Services included:
  • Fabrication and installation of a ladder for the exterior of the water tank with a wire safety fall arrest systems
  • Fabrication and installation of a ladder for the interior of the water tank with a wire safety fall arrest systems
  • Installation of two 30' and one 24' manways
  • Repair of cracks and spalling in the structural foundation of the tank
  • Welding of base anchor bolts and nuts
  • Replacement of roof access hatch and vent
  • Raising of 6' inlet and 8' outlet pipes 150' to the interior of the water tank
  • Sealing top of riser to tank to make wet riser into a dry riser
  • Installation of a 5' overflow 150' with splash pad and security flapper valve
  • Raising of handrail to meet current OSHA compliance
  • Welding of the circumference of the post head to shell connections
  • Installing a handrail at the top of the tank for safety of personnel
  • Replacing of access hatch for entry into the tank from the top of the tank
  • 75% of all work was completed using man lifts and suspended activities